- Regs out of compliance –
- 1011.7 – Ceiling tile in admin area needs replaced in CL2. Small section with peeling paint in CL3. In kitchen area, clean food compartment areas, vacuum rugs. In South unit, laundry room wall should be cleaned. In East unit, hole in sheetrock by room 2 and floor needs cleaned in bathroom. In North unit, a rough spot needs sanded on cabinet in bathroom. In West unit, room 6 has piece of trim missing and sheetrock needed in hallway due to hole (Compliance date 12/30/19).
- 1012.4 – In South unit, room 5 paint is peeling and bubbling on bathroom wall. In East unit, bathroom in room wall needs painted or repaired for dark spots. In West unit, room 4 has nail sticking out in bathroom cabinet.
- TA –
- Viewed all rooms w/average temperature. Clean mirrors in seclusion room. All bathrooms in progress of remodel. Painting main areas still in progress. South unit painting completed.
PRLU or OLTC
Licensing Compliance Record